File #: 25-0864    Version: 1
Type: Consent Staff Report Status: Agenda Ready
File created: 8/27/2025 In control: Board of County Commissioners
On agenda: 9/23/2025 Final action:
Title: Amendment 1 to Agreement RFQ 2024039 Integrated Water Master Plan with HDR Engineering, Inc. for Wabasso Causeway Bridge Reuse Main Condition Assessment & Repair Design Services, IRCDUS Project ID: 31.24.509
Indexes: Agreement, Amendment, HDR Engineering, Re-Use, Wabasso Causeway
Attachments: 1. HDR Proposal for Amendment 1 to Agreement RFQ 2024039, 2. Executed Agreement RFQ 2024039 IWMP with HDR (PID 00.23.547)
Related files: 24-0499, 25-0670
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
TO:                                                    Indian River County Board of County Commissioners

THROUGH:                     John A. Titkanich, Jr, County Administrator

                     Sean C. Lieske, Director of Utility Services

FROM:                                          Howard G. Richards, PE, Manager - Capital Projects

DATE:                                          August 27, 2025

SUBJECT:                                          Amendment 1 to Agreement RFQ 2024039 Integrated Water Master Plan with HDR Engineering, Inc. for Wabasso Causeway Bridge Reuse Main Condition Assessment & Repair Design Services,

                                          IRCDUS Project ID: 31.24.509

__________________________________________________________________

BACKGROUND

To address anticipated increasing growth within Indian River County (IRC), the Department of Utility Services (IRCDUS) is undertaking the development of an Integrated Water Master Plan (IWMP) to help ensure continued availability of water, wastewater, and reuse services to its customers. The IWMP involves comprehensive analyses and assessments of current conditions and future demand for services to define short- and long-range Capital Improvement Plans (CIP) for IRCDUS. HDR Engineering, Inc. (HDR) was contracted to perform the IWMP project (IRCDUS Project ID: 00.23.547) for a total approved budget of $3,218,590.00.

HDR’s IWMP scope includes conducting condition assessments of horizontal (linear) assets to “develop estimates of remaining useful life (RUL), likelihood of failure (LOF), consequence of failure (COF), and overall risk using desktop data”. The IRCDUS horizontal asset base includes two (2) 12-inch diameter reuse water mains that are suspended along the Wabasso Causeway Bridge over the Indian River Lagoon (IRL), an environmentally sensitive estuary, and Intracoastal Waterway (ICW) that serve customers on the barrier island. Constructed in 1995, one of the mains was pre...