BACKGROUND
The Board recently directed staff to evaluate paving options for 32nd Avenue north of 43rd Street and to present findings for further review and guidance. At the March 25, 2025 presentation, staff outlined three conceptual options for paving and associated drainage improvements along the corridor. A key concern included a utility manhole protruding in the middle of the accessway near the intersection of 43rd Place and 32nd Avenue.
This update provides additional details on engineering, construction schedules, estimated costs, and the potential right-of-way impacts, or shared access alternatives related to this privately maintained street.
ANALYSIS
Following a detailed survey and assessment of potential impacts to adjacent property owners, the following updates are provided for Board consideration:
· 32nd Avenue (Access Easement): Under proposed options require a 30-foot right-of-way, affecting approximately 10 properties and vacant parcels along the corridor.
· 43rd Place (Private Road): Proposed improvements fall within the existing 30-foot ingress-egress easement and do not require additional land acquisition.
· Acquisition of Vacant Parcel(s): County will need to purchase a vacant parcel(s) for a retention pond to help alleviate flooding issues caused by paving.
BUDGETARY IMPACT
Funding and budget appropriations will be programmed based on the Board’s direction.
PREVIOUS BOARD ACTIONS
Staff report and presentation on March 25, 2025.
POTENTIAL FUTURE BOARD ACTIONS
Approval of Engineering and Construction contracts.
STRATEGIC PLAN ALIGNMENT
This project supports the County’s broader objective to enhance local ...