File #: 19-0353    Version: 1
Type: Department Staff Report Status: Agenda Ready
File created: 4/16/2019 In control: Utilities Services
On agenda: 4/23/2019 Final action: 4/23/2019
Title: Barrier Island Reclaimed Water Main System Analysis - Results
Indexes: Barrier Island Reuse Main System, John's Island Water Management, Reclaimed Water, Schulke, Bittle & Stoddard
Attachments: 1. Staff Report, 2. Preliminary Engineering Report, 3. Plans for North County Reuse Water Main Study

Title

Barrier Island Reclaimed Water Main System Analysis - Results

Recommended Action

Staff recommends that the Indian River County Board of County Commissioners consider the results of the A1A Barrier Island Reuse Water Main Feasibility Study.  The report indicates that the east side of the A1A corridor is in fact feasible and cost-competitive with the subaqueous route. It is important to note that John’s Island Water Management is constructing the subaqueous line, and while the County does not have the ability to unilaterally determine the routing of the proposed line, it does and will require the design and construction to meet or exceed industry standards as well as the County’s utility construction requirements