Skip to main content
File #: 25-1119    Version: 1
Type: Solid Waste Disposal District Status: Agenda Ready
File created: 11/17/2025 In control: Solid Waste Disposal District
On agenda: 12/9/2025 Final action: 12/9/2025
Title: Work Order No. 10 to Geosyntec for Annual Compliance Monitoring and Reporting for 2026
Indexes: Compliance Monitoring, Geosyntec, Work Order
Attachments: 1. WORK ORDER No 10 2026 Annual Compliance.pdf
TO: Solid Waste Disposal District Board of Commissioners

THROUGH: John A. Titkanich, Jr., County Administrator
Sean C. Lieske, Director of Utility Services

FROM: Himanshu H. Mehta, PE, Managing Director, Solid Waste Disposal District

DATE: November 17, 2025

SUBJECT: Work Order No. 10 to Geosyntec for Annual Compliance Monitoring and Reporting for 2026
__________________________________________________________________

BACKGROUND
The Solid Waste Disposal District (SWDD) landfill operation is a highly regulated activity, which requires environmental compliance documentation in accordance with several different permits. Many of the compliance reports are prepared and certified by a third-party professional engineer. This agenda item requests authorization to engage the engineering firm of Geosyntec Consultants (Geosyntec) to perform the following tasks related to both permitting and reporting:

Semi-annual and annual reports to assess the characteristics of ground and surface water at the site generated by the Class I landfill in accordance with the site’s landfill permits.

Quarterly Assessment monitoring and reporting for the Class I landfill, and Construction and Demolition (C&D) Debris Disposal Facility.

Annual reports required by the site’s Title V air quality permit, including the annual statement of compliance, the annual operating report, semi-annual monitoring report, and the annual landfill gas sulfur content test.

Storage Tank Monitoring, Well Installation, and Reporting.

Landfill Gas Migration Monitoring.

In addition, a general technical assistance and permit compliance phase is included, as SWDD often requires engineering, technical, and construction services assistance in connection with annual facility upgrade, compliance, and operations.

ANALYSIS

Geosyntec has prepared Work Order No. 10, provided in Attachment 1, for engineering services detailing the scope of work, budget, and schedule for each of the tasks. The fees to b...

Click here for full text