Skip to main content
File #: 25-1130    Version: 1
Type: Solid Waste Disposal District Status: Agenda Ready
File created: 11/21/2025 In control: Solid Waste Disposal District
On agenda: 12/9/2025 Final action: 12/9/2025
Title: IRC Landfill Work Order No. 2 to Geosyntec for Partial Closure Design and Landfill Gas System Evaluation
Attachments: 1. IRC Partial Closure & GCCS Evaluation.pdf

TO:                                                    The Solid Waste Disposal District Board of Commissioners

 

THROUGH:                                          John A. Titkanich, Jr., County Administrator

                                                               Sean C. Lieske, Director of Utility Services

 

FROM:                                          Himanshu H. Mehta, PE, Managing Director, Solid Waste Disposal District

 

DATE:                                          November 21, 2025

 

SUBJECT:                                          IRC Landfill Work Order No. 2 to Geosyntec for Partial Closure Design and Landfill Gas System Evaluation

__________________________________________________________________

 

BACKGROUND

The Florida Department of Environmental Protection (FDEP) permit for the Indian River County (IRC) Class 1 landfill requires closure of areas of the permitted landfill that reach final elevation. This is to reduce odors, capture landfill gas and reduce the production of leachate into the landfill.

 

The Solid Waste Disposal District (SWDD) staff is requesting authorization for Geosyntec Consultants, Inc. (Geosyntec) to provide design services for the partial (north face) and temporary (south face) closure of Segment 3 Cell 1 and Cell 2 at the IRC Class I Landfill as well as an evaluation and optimization of the Gas Collection and Control System (GCCS).

 

ANALYSIS

Geosyntec has prepared IRC Landfill Work Order No. 2, provided in Attachment 1, for engineering services detailing the scope of work, budget, and schedule for each of the tasks. The fees to be paid by SWDD for the execution of this work authorization are in accordance with the Continuing Contract Agreement for Engineering Consulting Services dated April 4, 2023. The phases and their estimated fees are listed below.

 

PHASE

DESCRIPTION

AMOUNT

Phase 1

General Consulting/Meeting Support/Project Management

$36,567.24

Phase 2

Closure Alternative Evaluation, Costing, and Selection

$32,741.70

Phase 3

Partial / Temporary Closure of Cell 1 and Cell 2

$122,166.02

Phase 4

FDEP Engagement and Permit Modification

$59,484.34

Phase 5

Assessment of Existing GCCS

$85,071.79

Phase 6

Wellfield Evaluation

$43,888.84

Phase 7

Future Wellfield Expansion Evaluation

$24,253.30

Phase 8

Miscellaneous Engineering Support Services

$11,866.25

TOTAL (Lump Sum) =

$416,039.48

 

BUDGETARY IMPACT

Funding, in the amount of $416,039.48, for the engineering services for Segment 3 Closure will come from the SWDD/Accrued Closure - I, II & Infill account, number 411-239006.

 

POTENTIAL FUTURE BOARD ACTIONS

Bidding and Construction Services

 

STRATEGIC PLAN ALIGNMENT

Infrastructure

 

STAFF RECOMMENDATION

Recommended Action

Staff recommends the Board approve IRC Landfill Work Order No. 2 with Geosyntec Consultants for $416,039.48 to provide engineering services related to the Partial Closure Design and GCCS Evaluation; and authorize the Chairman to execute the same, as presented.