File #: 19-1205    Version: 1
Type: Public Hearing Status: Agenda Ready
File created: 1/6/2020 In control: Public Hearings
On agenda: 1/21/2020 Final action: 1/21/2020
Title: Mandala Village, LLC's Request to Rezone Approximately 79.1 Acres from A-1, Agricultural-1 (up to 1 unit/5 acres) and RS-3, Residential Single-Family (up to 3 units/acre) to PDTND, Planned Development Traditional Neighborhood Design and to Obtain Conceptual PD Plan Approval for a Project to be known as Mandala Village [PD-19-01-01 / 2005120297-82906] (Quasi-Judicial)
Indexes: Planned Development / TND / Mixed Use, Public Hearing
Attachments: 1. Staff Report, 2. Location Map, 3. Aerial, 4. Excerpt from Draft 12/12/2019 PZC Minutes, 5. PDTND Rezoning Ordinance, 6. Conceptual PD Plan, 7. Conceptual Landscape Plan

Title

Mandala Village, LLC's Request to Rezone Approximately 79.1 Acres from A-1, Agricultural-1 (up to 1 unit/5 acres) and RS-3, Residential Single-Family (up to 3 units/acre) to PDTND, Planned Development Traditional Neighborhood Design and to Obtain Conceptual PD Plan Approval for a Project to be known as Mandala Village [PD-19-01-01 / 2005120297-82906] (Quasi-Judicial)

Recommended Action

Staff recommends that the Board of County Commissioners approve the proposed Planned Development Traditional Neighborhood Design (PDTND) rezoning and the conceptual PD plan, with the following conditions: 1. Prior to approval of the preliminary PD plan for Phase I, the developer shall: a. Obtain Public Works approval of the timing of the project’s required 53rd Street improvements, including turn lane improvements, or enter into a Developer’s Agreement for those improvements. b. Obtain Public Works approval of the final determination for the project’s required 58th Avenue ROW dedication, or enter into a Developer’s Agreement for the 58th Avenue ROW dedication. 2. Prior to issuance of a land development permit for Phase 1, the developer shall: a. Dedicate the required road right-of-way for 53rd Street without compensation, as shown on the conceptual PD plan. b. Dedicate the required road right-of-way for 58th Avenue without compensation, or as outlined in a Developer’s Agreement. c. Obtain Public Works approval of the final design of the project’s required 53rd Street improvements including the external sidewalk, final turn lane configurations, and the 58th Avenue/53rd Street intersection improvements, or as outlined in a Developer’s Agreement. d. Obtain Public Works approval of the final design for the stormwater improvements required to accept stormwater runoff from 53rd Street, or as outlined in a Developer’s Agreement. e. Obtain Public Works approval of the final design of the project’s external 58th Avenue sidewalk, or as outlined in a Developer’s Agreement. f. Provide a final design, acceptable to Traffic Engineering and MPO Staff, for the project transit stop. 3. Prior to issuance of a land development permit for any respective phase, the developer shall: a. Obtain Planning staff approval of the final landscape plan for the respective phase. b. Obtain Planning staff approval of the final streetlighting plan for the respective phase. c. Obtain Environmental Planning staff approval of the final tree protection and mitigation plan for the respective phase. 4. Prior to issuance of a certificate of completion for Phase 1, the developer shall construct all required 53rd Street improvements from 58th Avenue to the project’s full access connection, or as outlined in a Developer’s Agreement. 5. Prior to issuance of a certificate of completion for any project phase or sub-phase, the developer shall construct required improvements such as sidewalks and buffers that are tied to that specific phase or sub-phase, or otherwise guarantee completion of the improvements as provided for in the LDRs.